Leak Tunnel - Guavio Hydroelectric
Project Description
Description
EMGESA, within its program of operation and maintenance of the Guavio Hydroelectric Plant, decided to carry out a preventive maintenance inside the Leak Tunnel, to prevent any kind of disaster in it.
The capacity installed in its first stage is 1000MW, which can be expanded in a second stage to 1600MW.
Service Provided
Maintenance of the Leak Tunnel of Guavio Central.
Covered Length
+5000m.
Execution Time
2010.
Project Details
- Client Emgesa
- Date 08 Mar 2022