Pre-feasibility studies for the second tunnel of the La Línea and its related operations
Description
--
Services
Studies at the pre-feasibility level of the second Tunnel de la línea and its annexed works. The study of layout and geometric design, study of geology and geotechnics for Tunnels, hydrogeological, hydrological and hydraulic study, analysis of alternatives of the electromechanical systems and the corresponding control center, construction schedule budgets, study of alternatives for the location of the two toll stations and risk analysis are included. Also, it includes the management of the Pilot Tunnel during construction.
Covered Length
+5000m.
Execution Time
2013.
- Client Odinsa