Picchu Tunnels
Project Description
Services for the Geotechnical Design of the Trigo Tunnel Ruta del Sol Project - Sector 1
Description
--
Services
Studies and Designs of two road tunnels at phase I level located between Cusco - Chinchero road, the study and designs include two Picchu Twin tunnels with an estimated length of 3.75 km. (Peru).
Covered Length
1000-5000m.
Execution Time
2011.
Project Details
- Client PAVCOL
- Date 13 Jul 2021
- Categories