Skip to main content
Pilot Tunnel of the De la Línea Tunnel
  • Tunel piloto
Project Description
tolima-quindio

Pilot Tunnel of the De la Línea Tunnel

Description
The history of the Central Mountain Range Crossing Project: La Linea Tunnel, annexed works and Second Calarcá - Cajamarca Roadway, is part of the history of transportation in Colombia, and especially of the Central Mountain Range Crossing.

Geotunnels S.A.S. made the studies and designs to phase III for the construction and operation of the definitive tunnels of the II Centenary Line, each with a length of 8.8Km and 10.6Km.


Services
Civil studies and designs to Phase III for the adaptation of the Pilot Tunnel as a Rescue Tunnel.


Covered Length
+5000m.


Execution Time
2014.


Project Details
  • Client FunValle
  • Date 08 Mar 2022
  • Categories